Hunter Douglas Expansion

Project details

  • Client: Hunter Douglas
  • Type: Design-Build
  • Address: 132 First Gulf Boulevard, Brampton, ON
  • Size: 28,902 SF

Project description

Urbacon was engaged to design and build a 28,902 SF metal-clad expansion to the existing warehouse space. The project also included the interior renovation to existing office space within the facility. Hunter Douglas manufactures and distributes the industry’s largest collection of energy-efficient, custom-made window treatments, designed and assembled in Canada at their Brampton facility.

Skip to content