- Client: Rogers Communications Inc.
- Type: Design-Build
- Address: Toronto, ON
- Size: 8,000 SF
Project description
Urbacon worked with Rogers Shared Operations for the project goal of building a ‘B’ HUB for servicing 500,000 Rogers’ customers. This project was North America’s first installation of the KyotoCooling® system and was completed in 5 1/2 months. A KyotoCooling® system can dramatically reduce cooling power consumption in what is traditionally a high consumption Hub operation. Simple autonomous and self-adapting controls ensure dynamic adjustment to changing conditions inside and outside of the HUB. This project also involved some limited soil remediation due to previous contamination. While the building was originally scheduled for 8 months of construction, we completed the work in 5 1/2 months to meet the client’s needs.